TripStop INSTALLATION IS SAFE, SIMPLE AND EFFICIENT

Whether you’re working with TripStop for the first time, or you’ve used it before, you’ll find our 5-step installation process safe, simple and efficient.

FIVE SIMPLE STEPS TO SUSTAINABLE FOOTPATHS AND CYCLEWAYS

‘All you need for installation is a pair of hands and a hammer.’
step graphic
STEP 1

Carry required lengths of TripStop plus pegs and wedges to the formwork, so you have everything you need close by.

STEP 2

Place TripStop length in the trench. Insert each peg into the pre-drilled hole, then drive into the earth with a hammer so it’s pinned upright (vertical) in the trench.

STEP 3

Insert the wedge for each peg to lock the TripStop length at the correct height in the formwork.

STEP 4

Make sure the top of each peg sits flush with the top of the pre-drilled hole.

STEP 5

Make sure the base of the TripStop sits firmly on a solid base of crushed rock and sand whilst the top of the TripStop is finished flush with the surface of the concrete.

Our lightweight, compact design means TripStop is easy to carry, handle and place prior to the concrete pour. Want to see how it’s done?

To ensure outstanding, no-fail results, please install TripStop strictly following our guidelines.

PEGS & WEDGES

Your TripStop profiles arrive as a complete product set that includes enough pegs and wedges to perform the full installation. Please check our recommended number of pegs per length:

Pegs & Wedges Length
4 per 1.2m to 1.4m
5 per 1.5m to 1.9m
6 per 2.0m to 2.4m
7 per 2.5m to 2.9m
8 per 3.0m to 3.4m
9 per 3.5m to 3.9m
10 per 4.0m

Based on your soil density and the path depth you can choose from 7 peg lengths:

200mm

250mm

300mm

350mm

400mm

Got a burning question about the TripStop installation process? Our experienced team members are happy to answer any questions or provide further information.